INTEGRATED

FRAME &

COVER

SYSTEM

NEW, SUPERIOR MAINTENANCE HOLE SYSTEM

Maintenance hole design for storm & sanitary sewers hasnít changed in more than 50 years, until now. By switching to the IFC Maintenance Hole System, inflow and infiltration and road maintenance are greatly reduced which leads to growth for the area and substantial cost savings


ACCEPTED FOR USE
THE ROAD AUTHORITY (TRA)

A Solid, Robust, Impenetrable System That Lasts Longer

The IFC (Integrated Frame & Cover) System is a new, superior maintenance hole system designed to reduce inflow, infiltration and road deterioration

  • No more weak grade rings
  • Prevents inflow & infiltration
  • High strength engineered grout
  • Quick and easy installation/adjustment
  • Substantial road maintenance cost reduction
  • Able to withstand repeated traffic loads

Approved by numerous

municipalities across Ontario

Ten Adjustment Unit Sizes

Concrete adjustment units (which replace grade rings) to suit your site specific requirements, 100mm to 550mm in 50mm increments

Canadian, US & European Patents

Canadian Pat. No. 2,643,874
U.S. Pat. No. 8,573,883 & 9,011,035
European Pat. No. 2186945 (validated in GB, DE, FR, BE, AT, and CH)

Telescopic Frame & Cover

No disturbance to the surrounding material. Easily adjusted during base asphalting, final asphalting or road resurfacing. Embedded within the road surface

IFC Brochure

Download

IFC New Install Guide

Download

IFC Rehab Guide

Download

IFC Training & Certification Program

Only companies who have completed the IFC Training & Certification Program are permitted to install the IFC System. Contact us for more details

Certified Partners

8807 County Road 56
Utopia, ON
L0M 1T0

299 Brock Road South
Puslinch, ON
N0B 2J0

2099 Roseville Road
Cambridge, Ontario
N1R 5S3

© Copyright 2018 | DECAST Ltd. & Con Cast Pipe, Inc. | All rights reserved